Suffolk 230 kV
51 MW storage in Suffolk, VA · In queue since April 2026 · Proposed COD December 2031
51 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 8m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-12-31
The Suffolk 230 kV project is a proposed battery energy storage development project located in Suffolk, Virginia. Developed by Switchgrass Solar I, LLC, the project has a total proposed capacity of 51 MW and is classified as a standalone storage project. It would connect to the transmission system at the Suffolk 230 kV point of interconnection, within the service territory of Dominion.
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-1686 and holds an active status. It entered the queue on April 25, 2026, as a Generation Interconnection request, and is currently in study phase C01. The proposed commercial operation date is December 31, 2031.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Suffolk
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Switchgrass Solar I, LLC
Utility
Dominion
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Suffolk 230 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SUFFOLK 35 KV SUFFLKSP
- POI Substation
- Suffolk Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.