Marysville 345 kV (PJM-C01-1655) — Project Summary

Queue ID
PJM-C01-1655
Capacity
43.44 MW
Technology
Solar
Status
active
Location
Union, OH
Region
PJM
Developer
Cadence Solar Energy LLC
IA Status
—

Marysville 345 kV

PJM-C01-1655BetaActiveSolarPJMlive-pjm_cycle

43.44 MW generation in Union, OH · In queue since April 2026 · Proposed COD April 2028

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

43.44 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2 years

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-24

About

Marysville 345 kV (PJM queue ID PJM-C01-1655) is a proposed 43.44 MW solar generation project located in Union County, Ohio. The development project is being advanced by Cadence Solar Energy LLC and would connect to the transmission system of AEP at the Marysville 345 kV point of interconnection. It has been submitted under a Generation Interconnection service type and consists solely of solar generation capacity.

The project entered the PJM Interconnection queue on April 27, 2026, and currently holds an active status. It is being evaluated in PJM's C01 study phase, part of the regional transmission organization's cycle-based interconnection process. The proposed commercial operation date is April 24, 2028. The provided data does not report the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OH

County

Union

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Cadence Solar Energy LLC

Utility

AEP

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Marysville 345 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
MARYSVI234.5 KV CADEN1SP
POI Substation
Marysville Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Marysville 345 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.