Nescopeck - Tomhicken 230 kV (PJM-C01-1638) — Project Summary

Queue ID
PJM-C01-1638
Capacity
100 MW
Technology
Solar+Battery
Status
active
Location
Luzerne, PA
Region
PJM
Developer
Ampliform Development LLC
IA Status
—

Nescopeck - Tomhicken 230 kV

PJM-C01-1638BetaActiveSolar,Storage,HybridPJMlive-pjm_cycle

100 MW generation in Luzerne, PA · In queue since April 2026 · Proposed COD June 2030

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

100 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 2m

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-30

About

Nescopeck - Tomhicken 230 kV (queue ID PJM-C01-1638) is a proposed solar-plus-battery hybrid generation project in Luzerne County, Pennsylvania. Ampliform Development LLC is developing the project, which has a total capacity of 100 MW and combines solar photovoltaic generation with energy storage. The project data do not break out the capacities of the solar and storage components. The project would connect to the grid at the Nescopeck - Tomhicken 230 kV point of interconnection, within the service territory of the utility PPL.

The project is in the interconnection queue of PJM Interconnection, the regional transmission organization. It entered the queue on April 27, 2026, and has requested Generation Interconnection service. Its queue status is active, and it is being evaluated in PJM's Cycle 01 (C01) study phase. The developer has proposed a commercial operation date of June 30, 2030.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

PA

County

Luzerne

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Ampliform Development LLC

Utility

PPL

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Nescopeck - Tomhicken 230 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Nescopeck - Tomhicken 230 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.