Perryman 115 kV (PJM-C01-1579) — Project Summary

Queue ID
PJM-C01-1579
Capacity
555 MW
Technology
Gas
Status
active
Location
Harford, MD
Region
PJM
Developer
PERRYMAN GAS, LLC
IA Status
—

Perryman 115 kV

PJM-C01-1579BetaActiveNatural GasPJMlive-pjm_cycle

555 MW generation in Harford, MD · In queue since April 2026 · Proposed COD December 2029

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

555 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 8m

Study Phase

C01

Pre-Study0%
Queue EntryApr 25, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-15

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-10-25
Expected COD
2029-12-15
From queue filing
Developer
Perryman Gas, LLC
From queue filing
Status
Active
Active in PJM queue (Cycle 1, C01-1579), 555 MW gas, Harford County MD. No IA executed and no public permitting, construction or financing signals. Sibling battery requests C01-1555 and C01-1559 at the same 115 kV point of interconnection are separate projects.
Financing
Unannounced
About

Perryman 115 kV (queue ID PJM-C01-1579) is a proposed 555 MW natural gas generation project in Harford County, Maryland. The project is being developed by Perryman Gas, LLC and would connect to the transmission system at the Perryman 115 kV point of interconnection, within the service territory of Baltimore Gas and Electric (BGE). The proposed project has been linked to the existing operating Perryman plant (EIA plant ID 1556) in U.S. Energy Information Administration records.

The project is listed as active in the PJM Interconnection queue, which it entered on April 25, 2026, under a Generation Interconnection service request. It is being evaluated in PJM's C01 study phase. The developer's proposed commercial operation date is December 15, 2029. The available queue data does not indicate whether an interconnection agreement has been executed.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MD

County

Harford

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

PERRYMAN GAS, LLC

Utility

BGE

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Perryman 115 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
PERRYMAN13 KVCT 1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Perryman 115 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.