Peninsula 34.5 kV (PJM-C01-1455) — Project Summary

Queue ID
PJM-C01-1455
Capacity
29.12 MW
Technology
Battery
Status
active
Location
Hampton, VA
Region
PJM
Developer
Delorean Power LLC dba Lightshift Energy
IA Status
—

Peninsula 34.5 kV

PJM-C01-1455BetaActiveStoragePJMlive-pjm_cycle

29.12 MW storage in Hampton, VA · In queue since April 2026 · Proposed COD April 2028

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

29.12 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2 years

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-30

About

Peninsula 34.5 kV is a proposed battery energy storage project in Hampton, Virginia, with a total capacity of 29.12 MW. The development project is sponsored by Delorean Power LLC, doing business as Lightshift Energy, and would connect to the transmission system of Dominion, the local utility. The project's point of interconnection is the Peninsula 34.5 kV facility, from which the project takes its name.

The project is listed in the PJM Interconnection queue under queue ID PJM-C01-1455, with a queue entry date of April 27, 2026. It is seeking Generation Interconnection service and is currently in the C01 study phase, the cycle reflected in its queue identifier. As of the latest available data, the project holds an active status, with a proposed commercial operation date of April 30, 2028.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Hampton

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Delorean Power LLC dba Lightshift Energy

Utility

Dominion

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Peninsula 34.5 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Peninsula 34.5 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.