Meadow Lake 345 kV
103.1 MW generation in White, IN · In queue since April 2026 · Proposed COD April 2026
103.1 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
<1 month
Schedule
6 months past proposed COD
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-04-28
Meadow Lake 345 kV is a proposed 103.1 MW wind generation project in White County, Indiana. The development project is being pursued by Meadow Lake Wind Farm LLC and is listed in the PJM Interconnection queue under the identifier PJM-C01-1430. The project would connect to the transmission system at the Meadow Lake 345 kV point of interconnection, within the service territory of AEP. It has been submitted as a Generation Interconnection request.
The project entered the PJM queue on April 27, 2026, and carries a proposed commercial operation date of April 28, 2026. Its status is listed as active, and it is in the C01 study phase. The provided data does not specify the status of an interconnection agreement. The project has been linked, with a match confidence of 0.9, to an existing operating plant in U.S. Energy Information Administration records: Meadow Lake Wind Farm III LLC (EIA plant ID 57115).
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
White
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
MEADOW LAKE WIND FARM LLC
Utility
AEP
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Meadow Lake 345 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MEADOWLK34.5 KV MEDLK3WF
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Meadow Lake 345 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.