Sullivan 765 kV (PJM-C01-1395) — Project Summary

Queue ID
PJM-C01-1395
Capacity
2300 MW
Technology
Nuclear
Status
active
Location
Sullivan, IN
Region
PJM
Developer
Indiana Michigan Power Company
IA Status
—

Sullivan 765 kV

PJM-C01-1395BetaActiveNuclearPJMlive-pjm_cycle

2,300 MW generation in Sullivan, IN · In queue since April 2026 · Proposed COD June 2034

BA: MISOISO/RTO: PJMNERC: RFCRC: MISO

2,300 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2034

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 2m

Study Phase

C01

Pre-Study0%
Queue EntryApr 23, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2034-06-01

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-10-25
Expected COD
2034-06-01
From queue filing
Developer
American Electric Power
Filed as Indiana Michigan Power Company
Status
Active
Active in the PJM queue (C01-1395) and listed as 'In study' by GridGlasses. No IA, permit, or construction signals were found. The entry's name matches its point of interconnection, so it may be an early-stage placeholder.
Financing
Unannounced
About

Sullivan 765 kV is a proposed nuclear generation development project in Sullivan County, Indiana, with a total capacity of 2,300 MW. The project is being developed by Indiana Michigan Power Company, an operating subsidiary of AEP. It would connect to the grid at the Sullivan 765 kV point of interconnection, within the PJM Interconnection region.

The project is listed in the PJM interconnection queue under queue ID PJM-C01-1395 and has active status. It entered the queue on April 23, 2026, and has requested Generation Interconnection service. The project is in the C01 study phase, and its proposed commercial operation date is June 1, 2034. No interconnection agreement status is reported in the available data.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IN

County

Sullivan

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Indiana Michigan Power Company

Utility

AEP

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Sullivan 765 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
SULLIVAN69 KV T1
POI Substation
Sullivan Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Sullivan 765 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.