COMED MCLEAN SUBTATION 345 kV (PJM-C01-1389) — Project Summary

Queue ID
PJM-C01-1389
Capacity
150 MW
Technology
Wind
Status
active
Location
McLean, IL
Region
PJM
Developer
EDP Renewables North America LLC
IA Status
—

COMED MCLEAN SUBTATION 345 kV

PJM-C01-1389BetaActiveWindPJMlive-pjm_cycle

150 MW generation in McLean, IL · In queue since April 2026 · Proposed COD October 2030

BA: PJMISO/RTO: PJMNERC: SERCRC: MISO

150 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 6m

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-10-31

About

The proposed project identified as COMED MCLEAN SUBTATION 345 kV (queue ID PJM-C01-1389) is a 150 MW wind generation development project located in McLean County, Illinois. It is being developed by EDP Renewables North America LLC. The project would connect to the transmission system at the ComEd McLean Substation at the 345 kV level, within the service territory of the utility ComEd.

The project is listed as active in the PJM Interconnection queue. It entered the queue on April 27, 2026, under the Generation Interconnection service type, and is currently in study phase C01 of PJM's cycle-based interconnection process. The proposed commercial operation date is October 31, 2030. The provided data does not indicate an executed interconnection agreement, a link to an existing operating plant, or recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

McLean

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

EDP Renewables North America LLC

Utility

ComEd

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

COMED MCLEAN SUBTATION 345 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
POI Substation
Mclean Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about COMED MCLEAN SUBTATION 345 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.