Pleasant Valley 138 kV
250 MW storage in McHenry, IL · In queue since April 2026 · Proposed COD August 2029
250 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 4m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-08-15
Pleasant Valley 138 kV is a proposed battery energy storage development project in McHenry County, Illinois, with a total capacity of 250 MW. The project is being developed by Hamilton Energy Center Project, LLC and would connect to the transmission system at the Pleasant Valley 138 kV point of interconnection, within the service territory of the utility ComEd. It is a standalone storage project and has no other generation components.
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-1387 and is classified as a Generation Interconnection request. It entered the queue on April 27, 2026, and its status is active. The project is in the C01 study phase, part of PJM's cycle-based interconnection process. Its proposed commercial operation date is August 15, 2029. The available data does not indicate that an interconnection agreement has been executed.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
McHenry
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
HAMILTON ENERGY CENTER PROJECT, LLC
Utility
ComEd
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Pleasant Valley 138 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- N ILLINOIS HUB
- POI Substation
- Pleasant Valley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Pleasant Valley 138 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.