Curdsville - Willis 115 kV
100 MW storage in Prince Edward, VA · In queue since April 2026 · Proposed COD September 2031
100 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 5m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-09-15
Curdsville - Willis 115 kV is a proposed 100 MW battery energy storage development project in Prince Edward County, Virginia. The project is being developed by Cumberland Solar USA, LLC and would connect to the transmission system of Dominion, the local utility. Its point of interconnection is the Curdsville - Willis 115 kV line, from which the project takes its name. The project is a standalone storage facility and is classified as a generation interconnection request.
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-1367 and holds active status. It entered the queue on April 24, 2026, and is being evaluated in PJM's Cycle 1 (C01) study phase. The proposed commercial operation date is September 15, 2031. The available data does not indicate an executed interconnection agreement, and the project has not been linked to an existing operating plant in EIA records.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Prince Edward
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Cumberland Solar USA, LLC
Utility
Dominion
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Curdsville - Willis 115 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Curdsville - Willis 115 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.