Calumet - Burnham 345 kV (PJM-C01-1355) — Project Summary

Queue ID
PJM-C01-1355
Capacity
500 MW
Technology
Battery
Status
active
Location
Cook, IL
Region
PJM
Developer
Big Shoulders Storage LLC
IA Status
—

Calumet - Burnham 345 kV

PJM-C01-1355BetaActiveStoragePJMlive-pjm_cycle

500 MW storage in Cook, IL · In queue since April 2026 · Proposed COD December 2030

BA: PJMISO/RTO: PJMNERC: SERCRC: MISO

500 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 8m

Study Phase

C01

Pre-Study0%
Queue EntryApr 27, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-31

Cross-source intelligence
Beta
Low confidence·3 sources·as of 2026-10-25
Expected COD
2030-12-31
From queue filing
Developer
Big Shoulders Storage LLC
From queue filing
Status
Active
Active in the PJM Cycle 1 queue (C01-1355). The earlier AG1-298 / TC1 entry for the same Calumet-Burnham 345 kV POI is listed as withdrawn. No construction or permitting activity found.
Financing
Unannounced
About

Calumet - Burnham 345 kV (queue ID PJM-C01-1355) is a proposed 500 MW battery energy storage development project located in Cook County, Illinois. The project is being developed by Big Shoulders Storage LLC and is designed to connect to the transmission system at the Calumet - Burnham 345 kV point of interconnection. ComEd is the transmission utility. The project is a standalone storage facility and has no hybrid generation components.

The project is listed as active in the interconnection queue administered by PJM Interconnection. It entered the queue on April 27, 2026, under a Generation Interconnection service request. It is being evaluated in PJM's Cycle 01 (C01) study phase, and the provided data does not indicate that an interconnection agreement has been executed. The developer has proposed a commercial operation date of December 31, 2030.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Cook

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Big Shoulders Storage LLC

Utility

ComEd

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Calumet - Burnham 345 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Calumet - Burnham 345 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.