Clinch River 138 kV
2 MW generation in Russell, VA · In queue since April 2026 · Proposed COD May 2026
2 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1 month
Schedule
6 months past proposed COD
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-05-01
Clinch River 138 kV (PJM queue ID PJM-C01-1285) is a proposed natural gas generation project in Russell County, Virginia. The developer is Appalachian Power Company, and the project lies within the service territory of utility AEP. It has a total proposed capacity of 2 MW and would connect to the grid at the Clinch River 138 kV point of interconnection.
The project is listed as active in the PJM Interconnection queue. It entered the queue on April 22, 2026, under the Generation Interconnection service type and is currently in study phase C01. Its proposed commercial operation date is May 1, 2026, about nine days after its queue entry date.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Russell
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Appalachian Power Company
Utility
AEP
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Clinch River 138 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CLINCHRI15.5 KV CR1
- POI Substation
- Clinch River Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Clinch River 138 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.