Shady Oaks Road 138 kV
99.5 MW generation in Lee, IL · In queue since April 2026 · Proposed COD June 2029
99.5 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 2m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
Shady Oaks Road 138 kV is a proposed 99.5 MW wind generation project located in Lee County, Illinois. The development project is being advanced by GSG 6, LLC and would interconnect to the transmission system operated by PJM Interconnection within the service territory of ComEd. The project's designated point of interconnection is the Shady Oaks Road 138 kV substation, and it is seeking Generation Interconnection service.
The project is listed in the PJM interconnection queue under queue ID PJM-C01-1276, with a queue entry date of April 22, 2026. It is currently active and is being evaluated in study phase C01. The proposed commercial operation date is June 1, 2029. The project has been linked to an existing operating facility in the U.S. Energy Information Administration (EIA) database, the Shady Oaks Wind Farm (EIA plant ID 57964), with a match confidence of 0.84.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Lee
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
GSG 6, LLC
Utility
ComEd
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Shady Oaks Road 138 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 100 SHAD34.5 KV GSG6WF
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Shady Oaks Road 138 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.