Meadow Brook - Greenland Gap 500 kV
37.95 MW generation in Hampshire, WV · In queue since April 2026 · Proposed COD August 2028
37.95 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 4m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-01
The Meadow Brook - Greenland Gap 500 kV project (queue ID PJM-C01-1237) is a proposed wind generation project in Hampshire County, West Virginia. It is being developed by CPV Springs Wind, LLC and has a total capacity of 37.95 MW. The project takes its name from its proposed point of interconnection, the Meadow Brook - Greenland Gap 500 kV transmission line, in the service territory of APS.
The project is in the interconnection queue of PJM Interconnection, the regional transmission organization. It entered the queue on April 27, 2026, as a Generation Interconnection request. It is currently active and being evaluated in study phase C01. Its proposed commercial operation date is August 1, 2028. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WV
County
Hampshire
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
CPV Springs Wind, LLC
Utility
APS
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Meadow Brook - Greenland Gap 500 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- GREENGAP35 KV G1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Meadow Brook - Greenland Gap 500 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.