Mountaineer 765 kV
10 MW generation in Mason, WV · In queue since April 2026 · Proposed COD May 2026
10 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1 month
Schedule
6 months past proposed COD
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-05-01
Mountaineer 765 kV is a proposed coal-fired generation project located in Mason County, West Virginia. The development project, identified in the PJM Interconnection queue as PJM-C01-1215, has a total capacity of 10 MW. It is being developed by Appalachian Power Company, with AEP as the associated utility. The project's point of interconnection is the Mountaineer 765 kV substation.
The project entered the PJM queue on April 22, 2026, under a Generation Interconnection service type, and is currently in active status within the C01 study phase. Its proposed commercial operation date is May 1, 2026, shortly after its queue entry. The available data does not indicate the status of an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WV
County
Mason
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Appalachian Power Company
Utility
AEP
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Mountaineer 765 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MOUNTAIN26 KV MT1
- POI Substation
- Mountaineer Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Mountaineer 765 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.