Lackawanna - Hopatcong 500 kV (PJM-C01-1194) — Project Summary

Queue ID
PJM-C01-1194
Capacity
750 MW
Technology
Gas
Status
active
Location
Lackawanna, PA
Region
PJM
Developer
Invitium Energy, LLC
IA Status
—

Lackawanna - Hopatcong 500 kV

PJM-C01-1194BetaActiveNatural GasPJMlive-pjm_cycle

750 MW generation in Lackawanna, PA · In queue since April 2026 · Proposed COD January 2034

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

750 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2034

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 9m

Study Phase

C01

Pre-Study0%
Queue EntryApr 25, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2034-01-01

Cross-source intelligence
Beta
Medium confidence·4 sources·as of 2026-10-25
Expected COD
2034-01-01
From queue filing
Developer
Invitium Energy (PPL Corp. / Blackstone Infrastructure joint venture)
Confirmed
Status
Active
Active in the PJM queue (filed about April 25, 2026), with no IA yet. The JV is assembling land in Lackawanna County (Archbald, Fell Twp.) for data-center power plants. This is a 750 MW companion to a 1,500 MW sister request (C01-1193).
Financing
Unannounced
About

Lackawanna - Hopatcong 500 kV (queue ID PJM-C01-1194) is a proposed 750 MW natural gas-fired generation project in Lackawanna County, Pennsylvania. The development project is sponsored by Invitium Energy, LLC and would be located within the service territory of PPL. Its proposed point of interconnection is the Lackawanna - Hopatcong 500 kV transmission line, from which the project takes its name.

The project is in the interconnection queue of PJM Interconnection, the regional transmission organization, and its status is active. It entered the queue on April 25, 2026, under a Generation Interconnection service request and is being evaluated in PJM's C01 study phase. The proposed commercial operation date is January 1, 2034.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

PA

County

Lackawanna

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Invitium Energy, LLC

Utility

PPL

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Lackawanna - Hopatcong 500 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Lackawanna - Hopatcong 500 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.