Lackawanna 230 kV
32 MW generation in Lackawanna, PA · In queue since April 2026 · Proposed COD December 2029
32 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 8m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-31
Lackawanna 230 kV is a proposed 32 MW natural gas generation project in Lackawanna County, Pennsylvania. The development project is sponsored by Lackawanna Energy Center LLC and would connect to the transmission system at the Lackawanna 230 kV point of interconnection, within the service territory of the utility PPL.
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-1170, with a queue entry date of April 24, 2026. It has requested Generation Interconnection service and is being evaluated in PJM's Cycle 1 (C01) study phase. Its status in the queue is active, and its proposed commercial operation date is December 31, 2029. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
PA
County
Lackawanna
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Lackawanna Energy Center LLC
Utility
PPL
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Lackawanna 230 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- LACKAWAN
- POI Substation
- Lackawanna Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Lackawanna 230 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.