Surry 230 kV
5.7 MW generation in Surry, VA · In queue since April 2026 · Proposed COD June 2028
5.7 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 2m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-30
Surry 230 kV (PJM queue ID PJM-C01-1162) is a proposed nuclear generation project in Surry County, Virginia. It is being developed by Virginia Electric and Power Company, which does business as Dominion Energy Virginia, and it has a total capacity of 5.7 MW. The project would connect to the grid at the Surry 230 kV point of interconnection in the Dominion utility service territory.
The project is listed as active in the PJM Interconnection queue. It entered the queue on April 27, 2026, under the Generation Interconnection service type, and is currently in study phase C01, part of PJM's cycle-based interconnection process. Its proposed commercial operation date is June 30, 2028. The available data do not indicate whether an interconnection agreement has been executed.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Surry
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
Utility
Dominion
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Surry 230 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- GRAVLNK 13 KV GT3
- POI Substation
- Surry Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Surry 230 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.