Cunningham - Elmont 500 kV (PJM-C01-1112) — Project Summary

Queue ID
PJM-C01-1112
Capacity
1694 MW
Technology
Gas
Status
active
Location
Cumberland, VA
Region
PJM
Developer
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
IA Status
—

Cunningham - Elmont 500 kV

PJM-C01-1112BetaActiveNatural GasPJMlive-pjm_cycle

1,694 MW generation in Cumberland, VA · In queue since April 2026 · Proposed COD June 2026

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

1,694 MW

Capacity

0

Components

6 months

In Queue

—

IA Status

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2 months

Schedule

4 months past proposed COD

Study Phase

C01

Pre-Study0%
Queue EntryApr 24, 2026

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-18

Cross-source intelligence
Beta
Low confidence·1 sources·as of 2026-10-25
Expected COD
2026-06-18
From queue filing
Developer
Dominion Energy Virginia (Virginia Electric and Power Company)
From queue filing
Status
Active
Active in the PJM queue (C01-1112); no IA executed and no public construction, permitting or financing news found for this specific entry.
Financing
Unannounced
About

Cunningham - Elmont 500 kV (queue ID PJM-C01-1112) is a proposed natural gas-fired generation project in Cumberland County, Virginia, with a total capacity of 1,694 MW. It is being developed by Virginia Electric and Power Company, which does business as Dominion Energy Virginia. The project is located within Dominion's utility service territory and would connect to the grid at the Cunningham - Elmont 500 kV point of interconnection.

The project is listed as active in the PJM Interconnection queue. It entered the queue on April 24, 2026, as a generation interconnection request and is being evaluated in the C01 study phase. Its proposed commercial operation date is June 18, 2026. The available data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Cumberland

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)

Utility

Dominion

Entity

PJM

Service Type

Generation Interconnection

Point of Interconnection

Cunningham - Elmont 500 kV

Data Source

live-pjm_cycle

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
FLUVANNA18 KV GS12

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Cunningham - Elmont 500 kV
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.