Chenoweth 345 kV
87.4 MW generation in Greene, OH · In queue since April 2026 · Proposed COD April 2028
87.4 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2 years
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-24
Chenoweth 345 kV (queue ID PJM-C01-1073) is a proposed solar generation project located in Greene County, Ohio. Developed by Fox Squirrel Solar LLC, the project has a total planned capacity of 87.4 MW. It is designed to connect to the transmission grid at the Chenoweth 345 kV point of interconnection, within the service territory of the utility AEP.
The project is listed as active in the interconnection queue administered by PJM Interconnection, the regional transmission organization. It entered the queue on April 26, 2026, and is being studied under PJM's C01 study phase as a Generation Interconnection request. The developer has proposed a commercial operation date of April 24, 2028.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OH
County
Greene
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Fox Squirrel Solar LLC
Utility
AEP
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Chenoweth 345 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Chenoweth 345 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.