Gritty Run 69 kV
13.394 MW generation in Pickaway, OH · In queue since April 2026 · Proposed COD December 2027
13.394 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 8m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
Gritty Run 69 kV is a proposed 13.39 MW generation development project located in Pickaway County, Ohio. The project is being developed by Tallgrass Columbus Community Power, LLC, and its technology is classified as "Other" in interconnection queue records. The project would connect to the transmission system at the Gritty Run 69 kV point of interconnection, within the service territory of the utility AEP.
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-1068, with a queue entry date of April 17, 2026. It has requested Generation Interconnection service and is currently in the C01 study phase, with an active status in the queue. The proposed commercial operation date is December 1, 2027. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OH
County
Pickaway
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Tallgrass Columbus Community Power, LLC
Utility
AEP
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Gritty Run 69 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Gritty Run 69 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.