Ada 12.47 kV
9.5 MW generation in Hardin, OH · In queue since March 2026 · Proposed COD August 2027
9.5 MW
Capacity
0
Components
7 months
In Queue
—
IA Status
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 5m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-08-31
The Ada 12.47 kV project is a proposed 9.5 MW solar generation project in Hardin County, Ohio. It is being developed by CF OH Solar SR 81, Ada, LLC, and is identified in the PJM Interconnection queue as PJM-C01-1064. The project would connect to the grid at the Ada 12.47 kV point of interconnection, within the service territory of the utility AEP. It has applied for generation interconnection service as a standalone solar facility.
The project entered the PJM queue on March 4, 2026, and its status is listed as active. It is being evaluated in the C01 study phase, which places it within PJM's cycle-based interconnection process. The proposed commercial operation date is August 31, 2027. The available data does not report the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OH
County
Hardin
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
CF OH Solar SR 81, Ada, LLC
Utility
AEP
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Ada 12.47 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Ada 12.47 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.