Beckton 25 kV
4.77 MW generation in Barren, KY · In queue since March 2026 · Proposed COD August 2027
4.77 MW
Capacity
0
Components
7 months
In Queue
—
IA Status
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 5m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-08-31
Beckton 25 kV (PJM queue ID PJM-C01-1062) is a proposed solar generation project in Barren County, Kentucky. The development project is sponsored by EDPR NA Distributed Generation LLC and has a total planned capacity of 4.77 MW. It would connect to the grid at the Beckton 25 kV point of interconnection, within the service territory of East Kentucky Power Cooperative (EKPC).
The project is listed as active in the interconnection queue of PJM Interconnection, the regional transmission organization. It entered the queue on March 4, 2026, and is seeking Generation Interconnection service. It is being evaluated in PJM's C01 study cycle. The developer's proposed commercial operation date is August 31, 2027. The available data does not indicate that an interconnection agreement has been executed.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
KY
County
Barren
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
EDPR NA Distributed Generation LLC
Utility
EKPC
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Beckton 25 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BECKTON 69 KV LOAD
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Beckton 25 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.