Mickleton 69 kV
56.3 MW storage in Gloucester, NJ · In queue since May 2025 · Proposed COD August 2030
56.3 MW
Capacity
0
Components
1y 5m
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 3m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-08-31
Mickleton 69 kV is a proposed battery energy storage development project located in Gloucester County, New Jersey. Developed by Calpine Mid-Atlantic Development, LLC, the project has a total proposed capacity of 56.3 MW. It is planned to connect to the grid at the Mickleton 69 kV point of interconnection, within the service territory of Atlantic City Electric (AEC).
The project is listed in the PJM Interconnection queue under queue ID PJM-C01-1010, with a queue entry date of May 29, 2025. It is registered as a Generation Interconnection request and is currently active, undergoing review in PJM's Cycle 1 (C01) study phase. The proposed commercial operation date is August 31, 2030.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NJ
County
Gloucester
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Calpine Mid-Atlantic Development, LLC
Utility
AEC
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Mickleton 69 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MICKLETO69 KV CT_1
- POI Substation
- Mickleton Peaking Plant Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Mickleton 69 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.