Benns Church 34.5 kV
20 MW generation in Isle of Wight, VA · In queue since May 2025 · Proposed COD December 2025
20 MW
Capacity
0
Components
1y 5m
In Queue
—
IA Status
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7 months
Schedule
11 months past proposed COD
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-02
Benns Church 34.5 kV (queue ID PJM-C01-1008) is a proposed 20 MW solar generation project located in Isle of Wight County, Virginia. The development project is being pursued by Prairie Solar, LLC and would connect to the electric grid at the Benns Church 34.5 kV point of interconnection, within the service territory of the utility Dominion. The project consists solely of solar photovoltaic generation, with no storage or other hybrid components listed.
The project is in the interconnection queue administered by PJM Interconnection, the regional transmission organization, where it entered on May 27, 2025, with a service type of Generation Interconnection. Its queue status is active, and it is being evaluated in PJM's C01 study phase, part of the transition cycle under the reformed interconnection process. The developer has proposed a commercial operation date of December 2, 2025. The provided data do not indicate whether an interconnection agreement has been executed.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Isle of Wight
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Prairie Solar, LLC
Utility
Dominion
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Benns Church 34.5 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Benns Church 34.5 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.