Project PJM-AI2-428 — Project Summary

Queue ID
PJM-AI2-428
Capacity
20.1 MW
Technology
Wind
Status
active
Location
Bureau, IL
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AI2-428

PJM-AI2-428BetaActiveWindPJMLBNL + Live

20.1 MW generation in Bureau, IL · In queue since March 2023 · Proposed COD December 2025

BA: PJMISO/RTO: PJMNERC: RFCRC: MISO

20.1 MW

Capacity

1

Components

Wind

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

2y 9m

Schedule

5 months past proposed COD

In Study38%
Queue EntryMar 9, 2023

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

Risk Analytics

Forward-looking exposure analytics for this queue project — climate hazards, expected generation variability, counterparty risk — into a single decision-grade view. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability
Counterparty exposure
About

PJM-AI2-428 is a proposed wind generation project with a total capacity of 20.1 MW. The project is located in Bureau County, Illinois, within the ComEd service area and the PJM Interconnection region. The project entered the PJM queue on March 9, 2023, with a proposed commercial operation date of December 31, 2025.

The interconnection agreement for PJM-AI2-428 is currently listed as "In Progress (unknown study)". The point of interconnection is the Crescent Ridge 138kV line, requiring a circuit increase.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Bureau

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Crescent Ridge 138kV (CIR Increase)

Data Source

LBNL + Live

Generation Forecast

Forward-looking generation outlook for this queue project with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year horizon (through 2034)
P10 / P50 / P90 confidence bands
Weather + policy + demand scenarios
Financial Forecast

Forward revenue, DSCR bands, and refinancing risk for this queue project, projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year cashflow horizon
P10 / P50 / P90 DSCR bands
Price + demand + policy scenarios
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No Ask reports yet for this entity.

Ask about Project PJM-AI2-428
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.