PJM-AH2-289
79.6 MW storage in Fulton, OH · In queue since March 2022 · Proposed COD December 2024
79.6 MW
Capacity
1
Components
Battery
4y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
2y 9m
Schedule
18 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-01
Forward-looking exposure analytics for this queue project — climate hazards, expected generation variability, counterparty risk — into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
PJM-AH2-289 is a proposed 79.6 MW battery storage project located in Fulton County, Ohio. The project is interconnected to the ATSI utility network within the PJM Interconnection region. The queue entry date for this project is March 10, 2022, with a proposed commercial operation date of December 1, 2024.
The interconnection agreement (IA) status for PJM-AH2-289 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the East Fayette 138 kV II substation.
Generated from interconnection queue and public data sources
State
OH
County
Fulton
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
East Fayette 138 kV II
Data Source
LBNL + Live
Forward-looking generation outlook for this queue project with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR bands, and refinancing risk for this queue project, projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- E_FAYET 34.5 KV ARCHESP
- POI Substation
- East Fayette Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project PJM-AH2-289Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.