PJM-AH1-734
270.3 MW generation in Indiana, PA · In queue since April 2025 · Proposed COD May 2030
270.3 MW
Capacity
1
Components
Gas
1y 7m
In Queue
System Impact Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 1m
Study Phase
TC2
Interconnection request submitted to ISO/RTO
Active; Phase 3; TC2
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-05-31
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Entered PJM queue for System Impact Study
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: No COD provided in LBNL queue snapshot and no news or search results available to establish a target date.
Developer: Only LBNL filing entity available. No news or search results to confirm if this is a shell LLC or operating company, or to identify a parent entity.
Status: LBNL status is 'active' with IA status at System Impact Study phase, indicating project is in early interconnection queue progression with no contradicting information.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PJM-AH1-734 is a proposed natural gas-fired generation project in Indiana County, Pennsylvania, under development by Armstrong Power, LLC. The project has a total capacity of 270.3 MW, consisting of a single gas generation component. It is located within the PJM Interconnection region, with APS as the associated utility, and is proposed to connect to the grid at the South Bend 500 kV point of interconnection.
The project entered the PJM interconnection queue on April 10, 2025, and currently holds an active status. It has requested Network Resource Interconnection Service (NRIS) and is participating in PJM's Transition Cycle 2 (TC2) study phase. Its interconnection agreement status is listed as System Impact Study, indicating the project is undergoing evaluation of its effects on the transmission system. The proposed commercial operation date is May 31, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
PA
County
Indiana
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Armstrong Power, LLC
Utility
APS
Entity
PJM
Service Type
NRIS
Point of Interconnection
South Bend 500 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SBEND 18 KV CT4
- POI Substation
- South Bend Generation Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.