Project PJM-AH1-727 — Project Summary

Queue ID
PJM-AH1-727
Capacity
425 MW
Technology
Battery
Status
active
Location
Loudoun, VA
Region
PJM
Developer
Cardinal Energy Storage East, LLC
IA Status
System Impact Study

PJM-AH1-727

PJM-AH1-727BetaActiveBatteryPJMLBNL + Live

425 MW storage in Loudoun, VA · In queue since April 2025 · Proposed COD June 2029

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

425 MW

Capacity

1

Components

Battery

1y 7m

In Queue

System Impact Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 2m

Study Phase

TC2

Impact Study25%
Queue EntryApr 10, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

Active; Phase 3; TC2

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-11

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 11, 2029
From queue filing
Developer in saved assessment
Cardinal Energy Storage East, LLC
From queue filing
Status at research time
Active
Active in PJM queue (AH1 cycle), at System Impact Study stage; no interconnection agreement executed yet and no public construction signals.
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only the LBNL snapshot provides a COD (proposed 2029-06-11). No news or live search findings were available to corroborate or contradict it.

Developer: Only the LBNL filing entity is available. It appears to be a project LLC, but no source identifies a parent or operating company, so none is asserted.

Status: LBNL lists status as active with a System Impact Study and no IA date. No external sources contradict or enrich this.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PJM-AH1-727 is a proposed battery energy storage development project located in Loudoun County, Virginia. Developed by Cardinal Energy Storage East, LLC, the standalone storage project has a total capacity of 425 MW. It is planned to connect to the transmission system at the Brambleton-Goose Creek 500kV point of interconnection, within the service territory of Dominion.

The project entered the PJM Interconnection queue on April 10, 2025, and holds an active status. It has requested Network Integration Resource Interconnection Service (NRIS) and is currently being evaluated in the TC2 study phase, with its interconnection agreement status listed as System Impact Study. The proposed commercial operation date for the project is June 11, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Loudoun

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Cardinal Energy Storage East, LLC

Utility

Dominion

Entity

PJM

Service Type

NRIS

Point of Interconnection

Brambleton-Goose Creek 500kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.