PJM-AH1-727
425 MW storage in Loudoun, VA · In queue since April 2025 · Proposed COD June 2029
425 MW
Capacity
1
Components
Battery
1y 7m
In Queue
System Impact Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 2m
Study Phase
TC2
Interconnection request submitted to ISO/RTO
Active; Phase 3; TC2
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-11
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only the LBNL snapshot provides a COD (proposed 2029-06-11). No news or live search findings were available to corroborate or contradict it.
Developer: Only the LBNL filing entity is available. It appears to be a project LLC, but no source identifies a parent or operating company, so none is asserted.
Status: LBNL lists status as active with a System Impact Study and no IA date. No external sources contradict or enrich this.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PJM-AH1-727 is a proposed battery energy storage development project located in Loudoun County, Virginia. Developed by Cardinal Energy Storage East, LLC, the standalone storage project has a total capacity of 425 MW. It is planned to connect to the transmission system at the Brambleton-Goose Creek 500kV point of interconnection, within the service territory of Dominion.
The project entered the PJM Interconnection queue on April 10, 2025, and holds an active status. It has requested Network Integration Resource Interconnection Service (NRIS) and is currently being evaluated in the TC2 study phase, with its interconnection agreement status listed as System Impact Study. The proposed commercial operation date for the project is June 11, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Loudoun
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Cardinal Energy Storage East, LLC
Utility
Dominion
Entity
PJM
Service Type
NRIS
Point of Interconnection
Brambleton-Goose Creek 500kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.