Project PJM-AH1-718 — Project Summary

Queue ID
PJM-AH1-718
Capacity
38 MW
Technology
Gas
Status
active
Location
Lee, IL
Region
PJM
Developer
Invenergy Nelson Expansion LLC
IA Status
System Impact Study

PJM-AH1-718

PJM-AH1-718BetaActiveGasPJMLBNL + Live

38 MW generation in Lee, IL · In queue since April 2025 · Proposed COD May 2028

BA: PJMISO/RTO: PJMNERC: SERCRC: MISO

38 MW

Capacity

1

Components

Gas

1y 7m

In Queue

System Impact Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 1m

Study Phase

TC2

Impact Study25%
Queue EntryApr 7, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

Active; Phase 3; TC2

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-29

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PJM-AH1-718 is a proposed 38 MW natural gas generation project located in Lee County, Illinois. The development project is being pursued by Invenergy Nelson Expansion LLC and would interconnect within the service territory of ComEd at the Nelson 345 kV point of interconnection. The project has requested Network Resource Interconnection Service (NRIS), and its full 38 MW capacity consists of a single gas-fired component.

The project entered the PJM Interconnection queue on April 7, 2025, and currently holds active status. It is being evaluated in the Transition Cycle 2 (TC2) study phase, with its interconnection agreement status listed as System Impact Study. The proposed commercial operation date is May 29, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Lee

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Invenergy Nelson Expansion LLC

Utility

ComEd

Entity

PJM

Service Type

NRIS

Point of Interconnection

Nelson 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
NELSON 138 KV SVC
POI Substation
Nelson Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.