PJM-AH1-714
174.1 MW generation in Lasalle, IL · In queue since April 2025 · Proposed COD March 2029
174.1 MW
Capacity
1
Components
Nuclear
1y 7m
In Queue
System Impact Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 11m
Study Phase
TC2
Interconnection request submitted to ISO/RTO
Active; Phase 3; TC2
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-24
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Queue entry filed with PJM, System Impact Study phase initiated
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: No COD provided in LBNL queue snapshot and no news or search results available to establish a target date.
Developer: LBNL lists Constellation Energy Generation, LLC as developer. This appears to be the operating entity itself rather than a shell LLC. No news or search results available to verify or contradict.
Status: LBNL status is 'active' with IA status at System Impact Study stage. This is a very recent queue entry (April 2025) with no contradicting information available.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PJM-AH1-714 is a proposed 174.1 MW nuclear generation project located in LaSalle County, Illinois. The development project is being pursued by Constellation Energy Generation, LLC, and would connect to the transmission system within the ComEd utility service territory. The project's point of interconnection is the LaSalle 345 kV substation. It has requested Network Resource Interconnection Service (NRIS).
The project entered the PJM Interconnection queue on April 9, 2025, and currently holds an active status. It is in the System Impact Study stage of the interconnection process and is being evaluated as part of PJM's Transition Cycle 2 (TC2) study phase. No interconnection agreement has yet been executed. The proposed commercial operation date for the project is March 24, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Lasalle
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Constellation Energy Generation, LLC
Utility
ComEd
Entity
PJM
Service Type
NRIS
Point of Interconnection
Lasalle 345 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 1 LASALL24 KV LA-1
- POI Substation
- LaSalle Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Constellation New Energy Inc
Data-driven briefing on Constellation Energy — fleet, generation, financial, and news signals.
ATI
Data-driven briefing on ATI — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.