Project PJM-AH1-711 — Project Summary

Queue ID
PJM-AH1-711
Capacity
408.2 MW
Technology
Gas
Status
active
Location
Wood, OH
Region
PJM
Developer
Troy Energy, LLC
IA Status
System Impact Study

PJM-AH1-711

PJM-AH1-711BetaActiveGasPJMLBNL + Live

408.2 MW generation in Wood, OH · In queue since April 2025 · Proposed COD May 2030

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

408.2 MW

Capacity

1

Components

Gas

1y 7m

In Queue

System Impact Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 1m

Study Phase

TC2

Impact Study25%
Queue EntryApr 9, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

Active; Phase 3; TC2

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-05-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 31, 2030
From queue filing
Developer in saved assessment
Troy Energy, LLC
From queue filing
Status at research time
Active
Active in PJM queue, System Impact Study stage; no IA date recorded and no external evidence of construction or financing.
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only the LBNL snapshot is available, with proposed COD of 2030-05-31. No news or search findings exist to corroborate or contradict it.

Developer: Only the LBNL filing entity 'Troy Energy, LLC' is available. No press releases or search results identify a parent or operating company.

Status: LBNL lists status as active with a System Impact Study in progress, and no other source contradicts this. The 2025 queue date is recent, so the status is plausibly current.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PJM-AH1-711 is a proposed natural gas-fired generation project located in Wood County, Ohio, within the PJM Interconnection region. Developed by Troy Energy, LLC, the project has a total proposed capacity of 408.2 megawatts (MW). It would connect to the transmission system operated by American Transmission Systems, Inc. (ATSI) at the Lemoyne 345 kV point of interconnection. The project has requested Network Resource Interconnection Service (NRIS).

The project entered the PJM interconnection queue on April 9, 2025, and remains active. It is currently in the System Impact Study stage and is being evaluated as part of PJM's Transition Cycle 2 (TC2) study phase. It does not yet have an executed interconnection agreement. The developer has proposed a commercial operation date of May 31, 2030.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

OH

County

Wood

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Troy Energy, LLC

Utility

ATSI

Entity

PJM

Service Type

NRIS

Point of Interconnection

Lemoyne 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
LEMOYNE218 KV UN1
POI Substation
Lemoyne Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project PJM-AH1-711
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.