Project PJM-AH1-702 — Project Summary

Queue ID
PJM-AH1-702
Capacity
88 MW
Technology
Nuclear
Status
active
Location
Ogle, IL
Region
PJM
Developer
Constellation Energy Generation, LLC
IA Status
System Impact Study

PJM-AH1-702

PJM-AH1-702BetaActiveNuclearPJMLBNL + Live

88 MW generation in Ogle, IL · In queue since April 2025 · Proposed COD June 2027

BA: PJMISO/RTO: PJMNERC: SERCRC: MISO

88 MW

Capacity

1

Components

Nuclear

1y 7m

In Queue

System Impact Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 2m

Study Phase

TC2

Impact Study25%
Queue EntryApr 7, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

Active; Phase 3; TC2

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PJM-AH1-702 is a proposed 88 MW nuclear generation project located in Ogle County, Illinois, within the PJM Interconnection region. The development project is sponsored by Constellation Energy Generation, LLC, and is situated in the service territory of ComEd. The project would interconnect at the Byron 345 kV point of interconnection and has requested Network Integration Resource Interconnection Service (NRIS).

The project entered the PJM interconnection queue on April 7, 2025, and its queue status is listed as active. It is being evaluated in PJM's Transition Cycle 2 (TC2) study phase, and its interconnection agreement status is at the System Impact Study stage. The proposed commercial operation date is June 1, 2027.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Ogle

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Constellation Energy Generation, LLC

Utility

ComEd

Entity

PJM

Service Type

NRIS

Point of Interconnection

Byron 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
6 BYRON 25 KV BY-1
POI Substation
Byron Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.