PJM-AH1-698
130 MW generation in Will, IL · In queue since April 2025 · Proposed COD May 2027
130 MW
Capacity
1
Components
Nuclear
1y 7m
In Queue
System Impact Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 1m
Study Phase
TC2
Interconnection request submitted to ISO/RTO
Active; Phase 3; TC2
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-05-06
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Project entered PJM interconnection queue, System Impact Study phase
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: No COD provided in LBNL queue snapshot and no news or search results available to establish a target date.
Developer: LBNL lists Constellation Energy Generation, LLC as developer. This appears to be the operating entity itself rather than a shell LLC. No news or search results available to verify or contradict.
Status: LBNL status is 'active' with IA status at System Impact Study stage. Queue date of April 2025 indicates very early-stage project with no contradicting information available.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PJM-AH1-698 is a proposed 130 MW nuclear generation project located in Will County, Illinois, within the PJM Interconnection region. The development project is sponsored by Constellation Energy Generation, LLC and would connect to the transmission system of ComEd, the local utility. The proposed point of interconnection is the Braidwood 345 kV substation, and the project has requested Network Integration Resource Service (NRIS).
The project entered the PJM interconnection queue on April 8, 2025, and holds an active status. It is currently in the System Impact Study stage and is being evaluated as part of PJM's Transition Cycle 2 (TC2) study phase. The project has a proposed commercial operation date of May 6, 2027. No interconnection agreement has yet been executed, as the project remains in the study process.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Will
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Constellation Energy Generation, LLC
Utility
ComEd
Entity
PJM
Service Type
NRIS
Point of Interconnection
Braidwood 345 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 20 BRAID24 KV BR-1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Constellation New Energy Inc
Data-driven briefing on Constellation Energy — fleet, generation, financial, and news signals.
ATI
Data-driven briefing on ATI — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.