Project PJM-AH1-698 — Project Summary

Queue ID
PJM-AH1-698
Capacity
130 MW
Technology
Nuclear
Status
active
Location
Will, IL
Region
PJM
Developer
Constellation Energy Generation, LLC
IA Status
System Impact Study

PJM-AH1-698

PJM-AH1-698BetaActiveNuclearPJMLBNL + Live

130 MW generation in Will, IL · In queue since April 2025 · Proposed COD May 2027

BA: PJMISO/RTO: PJMNERC: SERCRC: MISO

130 MW

Capacity

1

Components

Nuclear

1y 7m

In Queue

System Impact Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 1m

Study Phase

TC2

Impact Study25%
Queue EntryApr 8, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

Active; Phase 3; TC2

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-06

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
Constellation Energy Generation, LLC
From queue filing
Status at research time
Active
Active — System Impact Study phase, recently entered queue April 2025
Financing
Not recorded

Milestones in this assessment

IA executedApr 2025Latest in this assessment

Project entered PJM interconnection queue, System Impact Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: No COD provided in LBNL queue snapshot and no news or search results available to establish a target date.

Developer: LBNL lists Constellation Energy Generation, LLC as developer. This appears to be the operating entity itself rather than a shell LLC. No news or search results available to verify or contradict.

Status: LBNL status is 'active' with IA status at System Impact Study stage. Queue date of April 2025 indicates very early-stage project with no contradicting information available.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PJM-AH1-698 is a proposed 130 MW nuclear generation project located in Will County, Illinois, within the PJM Interconnection region. The development project is sponsored by Constellation Energy Generation, LLC and would connect to the transmission system of ComEd, the local utility. The proposed point of interconnection is the Braidwood 345 kV substation, and the project has requested Network Integration Resource Service (NRIS).

The project entered the PJM interconnection queue on April 8, 2025, and holds an active status. It is currently in the System Impact Study stage and is being evaluated as part of PJM's Transition Cycle 2 (TC2) study phase. The project has a proposed commercial operation date of May 6, 2027. No interconnection agreement has yet been executed, as the project remains in the study process.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Will

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Constellation Energy Generation, LLC

Utility

ComEd

Entity

PJM

Service Type

NRIS

Point of Interconnection

Braidwood 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
20 BRAID24 KV BR-1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.