PJM-AH1-695
859 MW generation in Dauphin, PA · In queue since April 2025 · Proposed COD October 2027
859 MW
Capacity
1
Components
Nuclear
1y 7m
In Queue
System Impact Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 6m
Study Phase
TC2
Interconnection request submitted to ISO/RTO
Active; Phase 3; TC2
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only the LBNL snapshot is available, and it lists a proposed COD of 2027-10-01. There are no news or search results to confirm or contradict it.
Developer: The developer comes only from the LBNL filing, 'Constellation Energy Generation, LLC'. No press releases or news were provided to identify a different parent or an ownership change.
Status: The LBNL status is 'active' and the project is not operational. No other sources contradict it.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PJM-AH1-695 is a proposed 859 MW nuclear generation project located in Dauphin County, Pennsylvania, within the PJM Interconnection region. The development project is sponsored by Constellation Energy Generation, LLC and would interconnect at the Three Mile Island 230 kV point of interconnection, within the service territory of the utility identified as ME. The project consists of a single nuclear component totaling 859 MW and has requested Network Integration Resource Service (NRIS) as its interconnection service type.
The project entered the PJM interconnection queue on April 3, 2025, and remains in active status. It is currently in the System Impact Study stage of the interconnection process and is being evaluated within PJM's Transition Cycle 2 (TC2) study phase. The proposed commercial operation date is October 1, 2027.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
PA
County
Dauphin
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Constellation Energy Generation, LLC
Utility
ME
Entity
PJM
Service Type
NRIS
Point of Interconnection
Three Mile Island 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MIDDLJCT69 KV LANC
- POI Substation
- Three Mile Island 500kV Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
SMUD at Van Conett
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Constellation New Energy Inc
Data-driven briefing on Constellation Energy — fleet, generation, financial, and news signals.
ATI
Data-driven briefing on ATI — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.