Bear Garden 230kV
51 MW generation in Buckingham, VA · In queue since April 2025 · Proposed COD June 2029
51 MW
Capacity
0
Components
1y 7m
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Research sources and reasoning (1 recorded sources)
medium confidence at research time
Commercial operation date: ENR article from June 2010 reported project >50% complete with expected COD of May 2011. LBNL queue entry is from 2025 with no proposed COD, indicating this is likely a re-entry or administrative update for an already-operational facility.
Developer: ENR article identifies 'Dominion Virginia Power' as developer. LBNL entry has null developer field. Dominion Virginia Power is now branded as Dominion Energy Virginia (parent: Dominion Energy).
Status: Construction was >50% complete in June 2010 with May 2011 target COD. The 2025 queue date with 'active' status for a 14-year-old project suggests either the facility is operational and this is a modification/expansion, or there's a data quality issue with the queue entry.
About
Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Bear Garden 230kV project is a proposed 682 MW natural gas generation project located in Buckingham County, Virginia. The project is being developed within the Dominion service area and has appeared in recent industry news.
The project is listed in the PJM interconnection queue as entry PJM-AH1-687, which has been moved to TC2. The queue entry date is April 8, 2025. The project's status is currently listed as active.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Buckingham
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
Generation Interconnection
Data Source
Live · PJM
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14
View all articlesGeothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
What's the status of the 1 queue project linked to Bear Ridge?
Data-driven briefing on Bear Garden 230kV — fleet, generation, financial, and news signals.
Bear Garden 230kV
Data-driven briefing on Bear Garden 230kV — fleet, generation, financial, and news signals.
Everson Garden
Data-driven briefing on Bear Garden 230kV — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.