Cunningham 500 kV (PJM-AH1-681 - moved to TC2) — Project Summary

Queue ID
PJM-AH1-681 - moved to TC2
Capacity
27.3 MW
Technology
Gas
Status
active
Location
Fluvanna, VA
Region
PJM
Developer
—
IA Status
—

Cunningham 500 kV

PJM-AH1-681 - moved to TC2BetaActiveNatural GasPJMLive · PJM

27.3 MW generation in Fluvanna, VA · In queue since June 2025 · Proposed COD May 2026

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

27.3 MW

Capacity

0

Components

1y 5m

In Queue

—

IA Status

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

11 months

Schedule

7 months past proposed COD

Pre-Study0%
Queue EntryJun 3, 2025

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-05-01

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusProposedVirginia Mercury · 2025-10-24

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
—
Status at research time
Active
Active — early-stage queue entry (June 2025), no interconnection agreement or construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedJun 2025Latest in this assessment

Entered PJM interconnection queue as AH1-681, later moved to TC2

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: No COD information available in LBNL snapshot or search results. Project queued June 2025 with no proposed operation date.

Developer: No developer information in LBNL filing or search results. Project appears to be early-stage queue entry with minimal public disclosure.

Status: LBNL status shows active queue position. No contradicting information found; project appears to be in initial interconnection study phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Cunningham 500 kV project is a proposed 1,000 MW natural gas generation project located in Fluvanna County, Virginia. The project is being developed within the Dominion service area and has appeared in recent news coverage.

The project is listed in the PJM interconnection queue as entry PJM-AH1-681, which has been moved to TC2. The queue entry date is June 3, 2025. The project's interconnection status is currently active.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Fluvanna

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

Dominion

Entity

PJM

Service Type

Generation Interconnection

Data Source

Live · PJM

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.