PJM-AH1-664
100 MW generation in Fleming, KY · In queue since February 2025 · Proposed COD September 2029
100 MW
Capacity
1
Components
Solar
1y 9m
In Queue
System Impact Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 7m
Study Phase
TC2
Interconnection request submitted to ISO/RTO
Active; Phase 3; TC2
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-01
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Queue application submitted to PJM, System Impact Study phase initiated
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: LBNL queue snapshot does not include a proposed COD, and no news or search findings provide any target date.
Developer: Only LBNL filing entity 'Hummingbird Energy LLC' is available. No news or search results to confirm if this is a shell LLC or operating company, or to identify a parent entity.
Status: LBNL reports 'active' status with 'System Impact Study' in progress. No contradictory information from other sources.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PJM-AH1-664 is a proposed 100 MW solar development project in Fleming County, Kentucky, under development by Hummingbird Energy LLC. The project is located within the PJM Interconnection region, in the service territory of East Kentucky Power Cooperative (EKPC). It would connect to the grid at the Goddard-Plumville 138 kV point of interconnection. The project consists of a single solar generation component with no paired storage, and it has requested Network Resource Interconnection Service (NRIS).
The project entered the PJM interconnection queue on February 21, 2025, and its queue status is listed as active. It is being evaluated in PJM's Transition Cycle 2 (TC2), and its interconnection agreement status is at the System Impact Study stage. The developer has proposed a commercial operation date of September 1, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
KY
County
Fleming
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Hummingbird Energy LLC
Utility
EKPC
Entity
PJM
Service Type
NRIS
Point of Interconnection
Goddard-Plumville 138 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project PJM-AH1-664Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.