Project PJM-AH1-664 — Project Summary

Queue ID
PJM-AH1-664
Capacity
100 MW
Technology
Solar
Status
active
Location
Fleming, KY
Region
PJM
Developer
Hummingbird Energy LLC
IA Status
System Impact Study

PJM-AH1-664

PJM-AH1-664BetaActiveSolarPJMLBNL + Live

100 MW generation in Fleming, KY · In queue since February 2025 · Proposed COD September 2029

BA: PJMISO/RTO: PJMNERC: SERCRC: MISO

100 MW

Capacity

1

Components

Solar

1y 9m

In Queue

System Impact Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 7m

Study Phase

TC2

Impact Study25%
Queue EntryFeb 21, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

Active; Phase 3; TC2

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
Hummingbird Energy LLC
From queue filing
Status at research time
Active
Active — System Impact Study phase, early-stage interconnection process
Financing
Not recorded

Milestones in this assessment

IA executedFeb 21, 2025Latest in this assessment

Queue application submitted to PJM, System Impact Study phase initiated

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: LBNL queue snapshot does not include a proposed COD, and no news or search findings provide any target date.

Developer: Only LBNL filing entity 'Hummingbird Energy LLC' is available. No news or search results to confirm if this is a shell LLC or operating company, or to identify a parent entity.

Status: LBNL reports 'active' status with 'System Impact Study' in progress. No contradictory information from other sources.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PJM-AH1-664 is a proposed 100 MW solar development project in Fleming County, Kentucky, under development by Hummingbird Energy LLC. The project is located within the PJM Interconnection region, in the service territory of East Kentucky Power Cooperative (EKPC). It would connect to the grid at the Goddard-Plumville 138 kV point of interconnection. The project consists of a single solar generation component with no paired storage, and it has requested Network Resource Interconnection Service (NRIS).

The project entered the PJM interconnection queue on February 21, 2025, and its queue status is listed as active. It is being evaluated in PJM's Transition Cycle 2 (TC2), and its interconnection agreement status is at the System Impact Study stage. The developer has proposed a commercial operation date of September 1, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

KY

County

Fleming

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Hummingbird Energy LLC

Utility

EKPC

Entity

PJM

Service Type

NRIS

Point of Interconnection

Goddard-Plumville 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project PJM-AH1-664
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.