Project PJM-AH1-567 — Project Summary

Queue ID
PJM-AH1-567
Capacity
5 MW
Technology
Gas
Status
withdrawn
Location
Will, IL
Region
PJM
Developer
University Park Energy, LLC
IA Status
System Impact Study

PJM-AH1-567

PJM-AH1-567BetaWithdrawnGasPJMLBNL + Live

5 MW generation in Will, IL · In queue since March 2025 · Proposed COD November 2025

Withdrawn from the PJM queue in September 2026, according to PJM's cycle queue (Oct 2026).

BA: PJMISO/RTO: PJMNERC: SERCRC: MISO

5 MW

Capacity

1

Components

Gas

1y 8m

In Queue

System Impact Study

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8 months

Study Phase

TC2

Queue EntryMar 5, 2025

Interconnection request submitted to ISO/RTO

Commercial Operation

Proposed COD: 2025-11-27

WithdrawnWithdrawn

Project withdrew from interconnection queue

About

Saved background

Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PJM-AH1-567 is a proposed 5 MW gas-fired generation project located in Will County, Illinois. The project is interconnected within the PJM Interconnection queue as of September 10, 2021, with a proposed commercial operation date of June 1, 2025. The interconnecting utility is ComEd, and the point of interconnection is the University Park 138 kV substation.

The project's interconnection agreement status is listed as "In Progress (unknown study)". The developer is unknown.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Will

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

University Park Energy, LLC

Utility

ComEd

Entity

PJM

Service Type

NRIS

Point of Interconnection

University Park 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
970 UP N13.5 KV UN-8
POI Substation
University Park South EC Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.