Honeybee Solar, LLC
300.8 MW generation in Brunswick, VA · In queue since January 2025 · Proposed COD March 2025
300.8 MW
Capacity
1
Components
Solar
1y 4m
In Queue
System Impact Study
IA Phase
COD target: 2025
Total Duration
2 months
Schedule
14 months past proposed COD
Study Phase
TC2
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-03-30
PJM-AH1-528 is a proposed solar generation project located in Brunswick County, Virginia, within the PJM Interconnection region. The project, with a total capacity of 300.8 MW, is being developed within Dominion's service territory. The project consists of 300.8 MW of solar photovoltaic generation.
The project entered the PJM interconnection queue on September 10, 2021, and has a proposed commercial operation date of March 30, 2025. Its interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Rawlings 500kV substation.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Brunswick
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Honeybee Solar Energy, LLC
Utility
Dominion
Entity
PJM
Service Type
NRIS
Point of Interconnection
Rawlings - Unity 500 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- RAWLINGS500 KV 1BUCK
- POI Substation
- Rawlings Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Honeybee Solar, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.