Heritage Solar Farm
19.25 MW generation in Ocean, NJ · In queue since March 2025 · Proposed COD September 2022
19.25 MW
Capacity
1
Components
Solar
1y 2m
In Queue
System Impact Study
IA Phase
COD target: 2022
Total Duration
1y 2m
Schedule
45 months past proposed COD
Study Phase
TC2
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-09-09
PJM-AH1-334 is a proposed solar generation project located in Ocean County, New Jersey, with a total capacity of 19.25 MW. The project, which interconnects with Jersey Central Power & Light (JCPL), entered the PJM interconnection queue on September 10, 2021, and has a proposed commercial operation date of September 9, 2022. Its interconnection agreement status is currently listed as "In Progress (unknown study)".
The development project consists solely of solar photovoltaic generation, with the full 19.25 MW capacity attributed to this technology. The point of interconnection is the Manchester - Whitings 34.5 kV line.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NJ
County
Ocean
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Heritage Solar Farm, LLC
Utility
JCPL
Entity
PJM
Service Type
NRIS
Point of Interconnection
Lakehurst - Whitings 34.5 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Heritage Solar FarmForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.