Poseidon Solar 2 (PJM-AH1-248) — Project Summary

Queue ID
PJM-AH1-248
Capacity
25 MW
Technology
Solar
Status
active
Location
Fayette, PA
Region
PJM
Developer
Poseidon Energy, LLC
IA Status
System Impact Study

Poseidon Solar 2

PJM-AH1-248BetaActiveSolarPJMLBNL

25 MW generation in Fayette, PA · In queue since February 2025 · Proposed COD December 2024

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

25 MW

Capacity

1

Components

Solar

1y 3m

In Queue

System Impact Study

IA Phase

COD target: 2024

Interconnection

Total Duration

1y 3m

Schedule

17 months past proposed COD

Study Phase

TC2

Impact Study25%
Queue EntryFeb 4, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-31

About

PJM-AH1-248 is a proposed solar generation project with a total capacity of 25 MW, located in Fayette County, Pennsylvania. The project is in the PJM interconnection queue, having entered on September 9, 2021, with a proposed commercial operation date of December 31, 2024. The interconnection agreement status is listed as "In Progress (unknown study)".

The project, which is being developed within the Allegheny Power Systems (APS) service area, consists solely of 25 MW of solar photovoltaic generation. The point of interconnection (POI) is the Lardin - Lake Lynn 138kV line.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

PA

County

Fayette

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Poseidon Energy, LLC

Utility

APS

Entity

PJM

Service Type

NRIS

Point of Interconnection

Lardin - Lake Lynn 138kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No Ask reports yet for this entity.

Ask about Poseidon Solar 2
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.