PJM-AG2-625
19.6 MW generation in Warren, NJ · In queue since February 2025 · Proposed COD April 2021
19.6 MW
Capacity
1
Components
Solar
1y 5m
In Queue
System Impact Study
IA Phase
COD target: 2021
Total Duration
1y 5m
Schedule
63 months past proposed COD
Study Phase
TC2
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-04-30
PJM-AG2-625 is a proposed solar generation project with a total capacity of 19.6 MW, located in Warren County, New Jersey. The project is interconnected within the PJM Interconnection queue as of March 31, 2021, with a proposed commercial operation date of April 30, 2021. The interconnection agreement status is listed as "In Progress (unknown study)". The designated point of interconnection (POI) is Pequest River-Furnace Brook Tap 34.5 kV II, and the utility is JCPL.
The development project consists solely of solar photovoltaic generation, with the 19.6 MW capacity attributed to this technology. The project's status within the PJM queue is currently listed as active.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NJ
County
Warren
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Chamberlain West Solar Farm LLC
Utility
JCPL
Entity
PJM
Service Type
NRIS
Point of Interconnection
Pequest River-Furnace Brook Tap 34.5 kV II
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project PJM-AG2-625Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.