Project PJM-AG2-441 — Project Summary

Queue ID
PJM-AG2-441
Capacity
113 MW
Technology
Solar
Status
active
Location
Charlotte, VA
Region
PJM
Developer
Virginia Electric and Power Company
IA Status
System Impact Study

PJM-AG2-441

PJM-AG2-441BetaActiveSolarPJMLBNL + Live

113 MW generation in Charlotte, VA · In queue since April 2025 · Proposed COD December 2030

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

113 MW

Capacity

1

Components

Solar

1y 7m

In Queue

System Impact Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 8m

Study Phase

TC2

Impact Study25%
Queue EntryApr 2, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

Active; Phase 3; TC2

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-31

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Dec 31, 2024
Differs from queue: Dec 31, 2030From queue filing
Developer in saved assessment
Virginia Electric and Power Company
From queue filing
Status at research time
Active
Active — in System Impact Study phase, proposed COD has passed without achieving operation
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2024-12-31. No external sources to validate or contradict this date, though it appears already past and project is still in System Impact Study phase.

Developer: LBNL lists Virginia Electric and Power Company (Dominion Energy's operating subsidiary) as developer. No external sources available to confirm if this is a shell LLC or the actual operating entity.

Status: LBNL status shows 'active' with project in System Impact Study phase. The proposed COD of 2024-12-31 has already passed, suggesting timeline delays are likely.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PJM-AG2-441 is a proposed 125 MW solar generation project located in Charlotte County, Virginia. The project is in the PJM interconnection queue as of March 30, 2021, with a proposed commercial operation date of December 31, 2024. Dominion is the listed utility.

The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The point of interconnection is the Twittys Creek - Madisonville 115 kV line. The project is listed as active in the interconnection queue.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Charlotte

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Virginia Electric and Power Company

Utility

Dominion

Entity

PJM

Service Type

NRIS

Point of Interconnection

Twittys Creek - Madisonville 115 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.