Project PJM-AG2-300 — Project Summary

Queue ID
PJM-AG2-300
Capacity
100 MW
Technology
Battery
Status
active
Location
Frederick, VA
Region
PJM
Developer
Meadow Brook Storage, LLC
IA Status
System Impact Study

PJM-AG2-300

PJM-AG2-300BetaActiveBatteryPJMLBNL + Live

100 MW storage in Frederick, VA · In queue since February 2025 · Proposed COD December 2029

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

100 MW

Capacity

1

Components

Battery

1y 9m

In Queue

System Impact Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 10m

Study Phase

TC2

Impact Study25%
Queue EntryFeb 5, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

Active; Phase 3; TC2

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-31

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Dec 31, 2023
Differs from queue: Dec 31, 2029From queue filing
Developer in saved assessment
Meadow Brook Storage, LLC
From queue filing
Status at research time
Active
Active — in System Impact Study phase, proposed COD has passed without construction evidence
Financing
Not recorded

Milestones in this assessment

COD targetDec 31, 2023Latest in this assessment

Original proposed COD per LBNL queue filing

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available showing proposed COD of 2023-12-31. This date is now 1+ years past and project is still in System Impact Study phase, indicating the date is stale but no alternative source exists to establish current target.

Developer: Only LBNL filing entity 'Meadow Brook Storage, LLC' is available. No research findings to identify parent company or operating entity behind this project LLC.

Status: LBNL shows 'active' status in System Impact Study phase. No news or research to contradict this queue position, though the 2023 COD target has clearly not been met.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed project PJM-AG2-300 is a 100 MW battery storage development in Frederick County, Virginia. It is located within the PJM Interconnection region and is being managed by utility APS. The project entered the PJM queue on March 23, 2021, with a proposed commercial operation date of December 31, 2023.

The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The point of interconnection is Meadow Brook 138 kV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Frederick

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Meadow Brook Storage, LLC

Utility

APS

Entity

PJM

Service Type

NRIS

Point of Interconnection

Meadow Brook 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
MEADOWBR500 KV SVC
POI Substation
Meadow Brook Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project PJM-AG2-300
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.