Project PJM-AG2-192 — Project Summary

Queue ID
PJM-AG2-192
Capacity
19 MW
Technology
Solar+Battery
Status
active
Location
Grant, IN
Region
PJM
Developer
BR Solar Sheriff 2 LLC
IA Status
System Impact Study

PJM-AG2-192

PJM-AG2-192BetaActiveSolarBatteryPJMLBNL

19 MW hybrid in Grant, IN · In queue since February 2025 · Proposed COD December 2023

BA: MISOISO/RTO: PJMNERC: RFCRC: MISO

19 MW

Capacity

1

Components

Solar

1y 5m

In Queue

System Impact Study

IA Phase

COD target: 2023

Interconnection

Total Duration

1y 5m

Schedule

31 months past proposed COD

Study Phase

TC2

Impact Study25%
Queue EntryFeb 25, 2025

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-15

About

PJM-AG2-192 is a proposed 20 MW hybrid solar and battery project located in Grant County, Indiana. The project, which consists of 20 MW of solar capacity, is in the PJM interconnection queue as of February 27, 2021, with a proposed commercial operation date of December 15, 2023. The interconnecting utility is AEP, and the point of interconnection is the Mississinewa 138 kV substation.

The project's interconnection status is listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IN

County

Grant

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

BR Solar Sheriff 2 LLC

Utility

AEP

Entity

PJM

Service Type

NRIS

Point of Interconnection

Mississinewa 138 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project PJM-AG2-192
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.