Jade Meadow III Solar Facility
300 MW hybrid in Garrett, MD · In queue since September 2020 · Proposed COD March 2029
300 MW
Capacity
1
Components
Solar
6y 2m
In Queue
IA Executed
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 6m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Engineering and Procurement
Project under construction
Typical: 18–30 months
Proposed COD: 2029-03-31
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Developer targets commercial operations in the second half of 2028.
revrenewables.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- revrenewables.com/jade-meadow-iii/
- cleanview.co/power-projects/developers/rev-renewables
- interconnection.fyi/project/pjm-ag1-363
- interconnection.fyi/projects/transmission-owner/allegheny-power
Commercial operation date: REV Renewables' project page states the project is "expected to begin construction in 2026, and reach commercial operations in the second half of 2028," versus the LBNL proposed COD of 2029-03-31. Only one developer source gives the date, so the year is used without a specific day.
Developer: LBNL developer field is null. The REV Renewables project page and Cleanview's REV developer pipeline list Jade Meadow III, and the Maryland PSC CPCN case (No. 9769) names the applicant as Jade Meadow III LLC, a project LLC.
Status: LBNL lists the project as active with an executed IA, and interconnection trackers show it as active. The REV page confirms continued development, with construction not yet started.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed Jade Meadow III Solar Facility is a 300 MW hybrid solar and battery energy storage project located in Garrett County, Maryland. The project consists of 300 MW of solar generation capacity. It is listed in the PJM interconnection queue as project AG1-363, with a queue entry date of September 30, 2020, and a proposed commercial operation date of March 31, 2028. The interconnecting utility is APS, and the point of interconnection is the Black Oak-Hatfield 500 kV line.
The project's interconnection agreement has been executed. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MD
County
Garrett
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
NRIS
Point of Interconnection
Black Oak-Hatfield 500 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.