Project PJM-AG1-341 — Project Summary

Queue ID
PJM-AG1-341
Capacity
106 MW
Technology
Solar+Battery
Status
active
Location
Metcalfe, KY
Region
PJM
Developer
IA Status
System Impact Study

PJM-AG1-341

PJM-AG1-341BetaActiveSolarBatteryPJMLBNL

106 MW hybrid in Metcalfe, KY · In queue since September 2020 · Proposed COD June 2023

BA: PJMISO/RTO: PJMNERC: SERCRC: MISO

106 MW

Capacity

1

Components

Solar

5y 8m

In Queue

System Impact Study

IA Status

COD target: 2023

Interconnection

Total Duration

2y 9m

Schedule

36 months past proposed COD

Impact Study25%
Queue EntrySep 30, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-06-15

Risk Analytics

Forward-looking exposure analytics for this queue project — climate hazards, expected generation variability, counterparty risk — into a single decision-grade view. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability
Counterparty exposure
About

PJM-AG1-341 is a proposed 106 MW hybrid solar and battery project located in Metcalfe County, Kentucky. The project, which consists of 106 MW of solar generation, is in the PJM interconnection queue, with queue entry date of September 30, 2020. The proposed commercial operation date is June 15, 2023. The interconnecting utility is EKPC.

The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Summer Shade 161 kV substation. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Metcalfe

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

EKPC

Entity

PJM

Service Type

Point of Interconnection

Summer Shade 161 kV

Data Source

LBNL

Generation Forecast

Forward-looking generation outlook for this queue project with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year horizon (through 2034)
P10 / P50 / P90 confidence bands
Weather + policy + demand scenarios
Financial Forecast

Forward revenue, DSCR bands, and refinancing risk for this queue project, projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year cashflow horizon
P10 / P50 / P90 DSCR bands
Price + demand + policy scenarios
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
EIGHTY8 34.5 KV GLOVERSP
POI Substation
Summer Shade Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No Ask reports yet for this entity.

Ask about Project PJM-AG1-341
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.