PJM-AG1-341
106 MW hybrid in Metcalfe, KY · In queue since September 2020 · Proposed COD June 2023
106 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
2y 9m
Schedule
36 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-06-15
Forward-looking exposure analytics for this queue project — climate hazards, expected generation variability, counterparty risk — into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
PJM-AG1-341 is a proposed 106 MW hybrid solar and battery project located in Metcalfe County, Kentucky. The project, which consists of 106 MW of solar generation, is in the PJM interconnection queue, with queue entry date of September 30, 2020. The proposed commercial operation date is June 15, 2023. The interconnecting utility is EKPC.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Summer Shade 161 kV substation. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
KY
County
Metcalfe
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Summer Shade 161 kV
Data Source
LBNL
Forward-looking generation outlook for this queue project with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR bands, and refinancing risk for this queue project, projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- EIGHTY8 34.5 KV GLOVERSP
- POI Substation
- Summer Shade Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project PJM-AG1-341Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.