Quarter Horse Solar
125 MW generation in Charlotte, VA · In queue since September 2020 · Proposed COD April 2031
125 MW
Capacity
1
Components
Solar
6y 2m
In Queue
IA Executed
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
10y 7m
Study Phase
TC1
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
EP; FINAL AGREEMENT; TC1
Project under construction
Typical: 12–24 months
Proposed COD: 2031-04-30
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed per LBNL queue status
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of March 2031. No independent news or press releases found to validate or contradict this date.
Developer: LBNL filing lists Virginia Electric and Power Company d/b/a Dominion Energy Virginia, which is the actual operating utility, not a shell LLC. This is a utility-owned project.
Status: LBNL shows active status with executed interconnection agreement. No news coverage found to indicate construction activity, delays, or cancellation.
About
Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PJM-AG1-285 is a proposed solar generation project with a total capacity of 125 MW. The project is located in Charlotte County, Virginia, and is being developed within the Dominion service area. It entered the PJM interconnection queue on September 28, 2020, with a proposed commercial operation date of December 1, 2024. Its interconnection status is currently in the Feasibility Study phase.
The point of interconnection for PJM-AG1-285 is the Chase City-Central 115 kV line. The project consists of 125 MW of solar photovoltaic generation.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Charlotte
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
Utility
Dominion
Entity
PJM
Service Type
NRIS
Point of Interconnection
Chase City-Central 115 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Bedford Solar (Dominion)
Data-driven briefing on Dominion Energy — fleet, generation, financial, and news signals.
500 Virginia Solar
Data tables and metrics from the InfraSure database.
Dominion-20230829006
Data-driven briefing on Dominion Energy — fleet, generation, financial, and news signals.
Dominion-20230829005
Data-driven briefing on Dominion Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.