Dolphin Solar
450 MW generation in Fountain, IN · In queue since September 2020 · Proposed COD March 2029
450 MW
Capacity
1
Components
Solar
6y 2m
In Queue
Feasibility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 6m
Study Phase
TC1
Interconnection request submitted to ISO/RTO
EP; FINAL AGREEMENT; TC1
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
- 2025·Geenex (Dolphin Solar LLC)→ENGIE (Geenex retained for development services)dolphinsolarproject.com
Milestones in this assessment
ENGIE acquired ownership of Dolphin Solar in early 2025 and retained Geenex for development services.
dolphinsolarproject.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- dolphinsolarproject.com/who-we-are/
- dolphinsolarproject.com/
- dolphinsolarproject.com/project-info/
- newsbug.info/wcinews/news/dolphin-solar-sues-fountain-county-over-permit/article_91dd9fab-30d1-4323-8e97-d02e40e70df1.html
Commercial operation date: No search result gives a COD or construction timeline. The project is still in permitting and litigation (Nov 2025 article: Dolphin Solar sues Fountain County over permit), so the LBNL date of 2029-03-31 is the only available figure.
Developer: The project website says Geenex originally developed Dolphin Solar. In early 2025 ENGIE acquired ownership and kept Geenex for development services. LBNL lists only the project shell LLC.
Status: LBNL shows the project as active with no IA executed. Search results show a pre-construction project in permitting and litigation, with no sign of withdrawal or construction.
About
Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed PJM-AG1-226 project is a 450 MW solar generation facility located in Fountain County, Indiana. The project, which is in the PJM interconnection queue, was entered on September 24, 2020, with a proposed commercial operation date of June 1, 2024. The interconnecting utility is AEP.
The project's interconnection status is currently in the Feasibility Study phase. The point of interconnection is the Eugene-Dequine 345 kV line. The development project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Fountain
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Dolphin Solar LLC
Utility
AEP
Entity
PJM
Service Type
NRIS
Point of Interconnection
Dequine-Eugene 345 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.